Nu-Calgon 4173-04 Evap-Treat Scale & Corrosion Inhibitor for Evaporative Coolers (up to 6,500 CFM) 6 x 1 cs.
Nu-Calgon 4173-04 Evap-Treat Scale & Corrosion Inhibitor for Evaporative Coolers (up to 6,500 CFM) 6 x 1 cs.
The Nu-Calgon 4173-04 Evap-Treat is a high-performance preventative maintenance treatment formulated specifically for evaporative coolers. Designed for units with airflow capacities up to 6,500 CFM,Packaging: 6 x 1 case (six 1-unit packs) this treatment uses NSF-certified 6R Micromet® inorganic phosphate to sequester hardness minerals, preventing scale buildup and corrosion, while improving overall system efficiency and prolonging the service life of cooling pads.
Key Features & Benefits
| Scale & Corrosion Inhibition | Protects cooler media and metal parts from mineral deposits and rust so that they work efficiently all season long. |
| Food-grade / NSF-certified 6R Micromet® | Safe, reliable protection using a specialty slowly soluble phosphate that’s designed for water contact surfaces. |
| Easy Installation & Upkeep | Simply place the cylinder in the cooler sump near the float valve or water inlet; replace every six months or at season’s end. |
| Extends Pad Life | Prevents scale from clogging or deteriorating the evaporative media, maintaining airflow and cooling performance. |
| Cost-Effective Seasonal Solution | Inexpensive solution that lasts throughout the cooling season, reducing repair costs and labor. |
Specifications
- Model / Part Number: 4173-04
- Capacity: Supports evaporative coolers up to 6,500 CFM
- Form / Packaging: Solid cylinder form, clear; designed to be placed in cooler sump
- Active Ingredient: 6R Micromet inorganic phosphate (slowly soluble, food-grade)
- Usage Interval: Replace every 6 months or at the end of the cooling season
Recommended Usage Instructions
- Clean and flush the evaporative cooler system if there is existing scale or buildup.
- Position the Evap-Treat cylinder in the cooler’s sump, ideally near the float valve or water inlet point for maximum contact & effectiveness.
- Ensure bleed, purge, or power dump is functioning to maintain water quality and prevent buildup: for up to 6,500 CFM systems use approximately 6.5 oz/min bleed rate.
- Monitor performance, inspect pads, replace Evap-Treat at the conclusion of the cooling season or every six months.
| Package Quantity | 1 Item |
|---|---|
| Item Returns | Sorry, the item can't be returned |
Write Your Own Review
